Crappy Architecture
When the best laid plans are the worst.
Monday, December 5
Down the Drain
"The drawings said the drain was supposed to be at grade level and that's where it is"
Friday, April 15
don't hire the culligan man as your m.e.p. guy
at least the shower is pure like the waters of lake minnetonka
Thursday, April 14
i'll have the number 2
looks like a wendy's table.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)